flag

Chiltern Ridge Half Marathon, 2024 course map and altimetry

Chiltern Ridge Half Marathon: 2024 route, altimetry, gpx

Note: "Chiltern Ridge Half Marathon" is NOT organized by goandrace.com

Chiltern Ridge Half Marathon course map. Lenght: 21.2 km (13.2 mi).

On this page is shown the 21.2 km (13.2 mi) course map of the event "Chiltern Ridge Half Marathon" in Wendover (Sunday, June 16, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Chiltern Ridge Half Marathon, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Chiltern Ridge Half Marathon event page.

Path statistics

Chiltern Ridge Half Marathon, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 143 179 +36 +3.6% 143 176 36 0
KM 1-2 179 243 +64 +6.4% 182 244 65 1
KM 2-3 243 241 -2 -0.2% 240 243 2 4
KM 3-4 241 211 -30 -3.0% 213 241 0 30
KM 4-5 211 209 -2 -0.2% 202 209 7 10
KM 5-6 209 170 -39 -3.9% 171 209 0 39
KM 6-7 170 196 +26 +2.6% 148 194 48 22
KM 7-8 196 232 +36 +3.6% 201 234 38 1
KM 8-9 232 237 +5 +0.5% 226 237 12 7
KM 9-10 237 244 +7 +0.7% 240 244 7 1
KM 10-11 244 233 -11 -1.1% 234 249 3 14
KM 11-12 233 215 -18 -1.8% 216 232 0 18
KM 12-13 215 162 -53 -5.3% 163 212 0 53
KM 13-14 162 165 +3 +0.3% 148 165 17 14
KM 14-15 165 211 +45 +4.5% 169 210 45 0
KM 15-16 211 216 +6 +0.6% 205 214 11 5
KM 16-17 216 255 +39 +3.9% 218 255 39 0
KM 17-18 255 250 -5 -0.5% 250 255 0 5
KM 18-19 250 239 -11 -1.1% 240 250 0 11
KM 19-20 239 167 -72 -7.2% 168 237 0 72
KM 20-21 167 138 -29 -2.9% 138 164 0 29
KM 21-21.20 138 138 0 0% 138 138 0 0