flag

Ironbridge Half Marathon, 2024 course map and altimetry

Ironbridge Half Marathon: 2024 route, altimetry, gpx

Note: "Ironbridge Half Marathon" is NOT organized by goandrace.com

Ironbridge Half Marathon course map. Lenght: 21.098 km (13.1 mi).

On this page is shown the 21.098 km (13.1 mi) course map of the event "Ironbridge Half Marathon" in Telford (Sunday, March 24, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Ironbridge Half Marathon, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. For instructions on how to upload the GPX file onto your Garmin watch click here.
NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Ironbridge Half Marathon event page.

Path statistics

Ironbridge Half Marathon, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 137 143 +6 +0.6% 137 156 19 13
KM 1-2 143 135 -8 -0.8% 132 142 6 14
KM 2-3 135 137 +2 +0.2% 134 138 4 2
KM 3-4 137 139 +2 +0.2% 134 141 7 5
KM 4-5 139 114 -25 -2.5% 114 138 0 25
KM 5-6 114 102 -12 -1.2% 101 116 2 14
KM 6-7 102 90 -12 -1.2% 91 102 1 13
KM 7-8 90 63 -27 -2.7% 60 89 0 27
KM 8-9 63 37 -26 -2.6% 37 63 0 26
KM 9-10 37 49 +12 +1.2% 33 50 15 3
KM 10-11 49 48 -1 -0.1% 44 52 4 5
KM 11-12 48 50 +1 +0.1% 44 51 6 4
KM 12-13 50 39 -11 -1.1% 38 50 0 11
KM 13-14 39 84 +45 +4.5% 38 84 45 0
KM 14-15 84 82 -2 -0.2% 71 97 23 25
KM 15-16 82 105 +23 +2.3% 82 102 23 0
KM 16-17 105 111 +6 +0.6% 105 112 9 3
KM 17-18 111 115 +4 +0.4% 105 117 13 9
KM 18-19 115 137 +22 +2.2% 114 136 22 0
KM 19-20 137 135 -2 -0.2% 134 141 5 7
KM 20-21 135 134 -1 -0.1% 134 139 5 6
KM 21-21.10 134 135 +1 +0.1% 134 135 2 0