flag

Mount Rainier Half Marathon & 5K, 2024 course map and altimetry

Mount Rainier Half Marathon & 5K: 2024 route, altimetry, gpx

Note: "Mount Rainier Half Marathon & 5K" is NOT organized by goandrace.com

Mount Rainier Half Marathon & 5K course map. Lenght: 21.098 km (13.1 mi).

On this page is shown the 21.098 km (13.1 mi) course map of the event "Mount Rainier Half Marathon & 5K" in Ashford, Washington (Saturday, July 20, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Mount Rainier Half Marathon & 5K, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Mount Rainier Half Marathon & 5K event page.

Path statistics

Mount Rainier Half Marathon & 5K, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 516 505 -11 -1.1% 506 516 0 11
KM 1-2 505 488 -17 -1.7% 490 501 0 17
KM 2-3 488 490 +1 +0.1% 479 490 8 7
KM 3-4 490 481 -8 -0.8% 482 491 1 9
KM 4-5 481 497 +16 +1.6% 480 497 17 1
KM 5-6 497 515 +18 +1.8% 498 515 18 0
KM 6-7 515 527 +11 +1.1% 516 526 11 0
KM 7-8 527 522 -4 -0.4% 523 528 1 5
KM 8-9 522 517 -5 -0.5% 516 522 1 6
KM 9-10 517 552 +35 +3.5% 518 550 35 0
KM 10-11 552 603 +51 +5.1% 554 602 51 0
KM 11-12 603 584 -19 -1.9% 585 623 17 36
KM 12-13 584 546 -37 -3.7% 547 580 0 37
KM 13-14 546 546 -1 -0.1% 546 547 0 1
KM 14-15 546 549 +3 +0.3% 546 548 3 0
KM 15-16 549 554 +6 +0.6% 549 553 6 0
KM 16-17 554 560 +6 +0.6% 555 561 7 1
KM 17-18 560 556 -4 -0.4% 556 561 3 7
KM 18-19 556 555 -1 -0.1% 555 556 1 2
KM 19-20 555 538 -16 -1.6% 539 555 0 16
KM 20-21 538 535 -3 -0.3% 529 537 6 9
KM 21-21.10 535 535 0 0% 535 535 0 0