flag

Ultra Sierra Nevada 2024, course map and altimetry

Ultra Sierra Nevada 2024: route, altimetry, gpx

Note: "Ultra Sierra Nevada 2024" is NOT organized by goandrace.com

Ultra Sierra Nevada 2024 course map. Lenght: 62 km (38.5 mi).

On this page is shown the 62 km (38.5 mi) course map of the event "Ultra Sierra Nevada 2024" in Granada (Friday, April 5, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Ultra Sierra Nevada 2024, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. For instructions on how to upload the GPX file onto your Garmin watch click here.
NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Ultra Sierra Nevada 2024 event page.

Path statistics

Ultra Sierra Nevada 2024: interactive route

You can set the km (or mile) markers and you can select different types of layers (Satellite or Openstreetmap).

Ultra Sierra Nevada 2024: altimetry graph

Ultra Sierra Nevada 2024: slope graph

Ultra Sierra Nevada 2024: percentage distribution of slope

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0.0329-1 728 792 +64 +6.4% 728 792 64 0
KM 1-2 792 895 +103 +10.3% 795 894 103 0
KM 2-3 895 852 -43 -4.3% 848 925 27 70
KM 3-4 852 864 +12 +1.2% 851 867 12 0
KM 4-5 864 884 +20 +2.0% 860 883 23 3
KM 5-6 884 1045 +161 +16.1% 884 1044 161 0
KM 6-7 1045 1116 +71 +7.1% 1045 1117 74 3
KM 7-8 1116 1171 +55 +5.5% 1096 1170 64 9
KM 8-9 1171 1140 -31 -3.1% 1122 1171 44 75
KM 9-10 1140 1091 -49 -4.9% 1060 1139 28 77
KM 10-11 1091 1093 +2 +0.2% 1075 1092 17 15
KM 11-12 1093 1160 +67 +6.7% 1102 1160 74 7
KM 12-13 1160 1259 +99 +9.9% 1161 1255 100 1
KM 13-14 1259 1327 +68 +6.8% 1259 1327 69 1
KM 14-15 1327 1276 -51 -5.1% 1278 1362 52 103
KM 15-16 1276 1238 -37 -3.7% 1239 1263 14 51
KM 16-17 1238 1162 -76 -7.6% 1163 1236 0 76
KM 17-18 1162 1072 -90 -9.0% 1038 1155 25 115
KM 18-19 1072 1072 +1 +0.1% 1070 1108 36 36
KM 19-20 1072 957 -115 -11.5% 960 1072 0 115
KM 20-21 957 892 -66 -6.6% 893 960 5 71
KM 21-22 892 881 -11 -1.1% 858 890 23 34
KM 22-23 881 831 -49 -4.9% 833 892 12 62
KM 23-24 831 916 +84 +8.4% 831 915 84 0
KM 24-25 916 1092 +177 +17.7% 918 1092 177 0
KM 25-26 1092 1173 +80 +8.0% 1096 1174 80 0
KM 26-27 1173 1261 +88 +8.8% 1173 1272 88 0
KM 27-28 1261 1274 +13 +1.3% 1245 1274 28 15
KM 28-29 1274 1408 +134 +13.4% 1274 1408 134 0
KM 29-30 1408 1412 +4 +0.4% 1406 1466 55 51
KM 30-31 1412 1328 -84 -8.4% 1317 1411 11 95
KM 31-32 1328 1208 -120 -12.0% 1209 1328 3 123
KM 32-33 1208 1125 -83 -8.3% 1141 1206 1 84
KM 33-34 1125 1037 -88 -8.8% 1036 1122 4 92
KM 34-35 1037 935 -102 -10.2% 934 1036 0 102
KM 35-36 935 781 -154 -15.4% 781 933 0 154
KM 36-37 781 774 -6 -0.6% 764 785 17 24
KM 37-38 774 868 +94 +9.4% 775 864 94 0
KM 38-39 868 915 +46 +4.6% 869 913 46 0
KM 39-40 915 1032 +117 +11.7% 881 1030 141 24
KM 40-41 1032 1116 +85 +8.5% 1033 1116 96 11
KM 41-42 1116 1061 -56 -5.6% 1060 1170 43 98
KM 42-43 1061 977 -84 -8.4% 953 1060 20 104
KM 43-44 977 1058 +81 +8.1% 977 1062 87 6
KM 44-45 1058 1176 +118 +11.8% 1026 1175 134 16
KM 45-46 1176 1244 +68 +6.8% 1175 1238 83 15
KM 46-47 1244 1441 +197 +19.7% 1245 1441 197 0
KM 47-48 1441 1586 +145 +14.5% 1450 1586 145 0
KM 48-49 1586 1661 +75 +7.5% 1587 1661 76 1
KM 49-50 1661 1685 +24 +2.4% 1651 1686 33 9
KM 50-51 1685 1674 -12 -1.2% 1672 1696 14 25
KM 51-52 1674 1658 -15 -1.5% 1652 1687 12 28
KM 52-53 1658 1669 +11 +1.1% 1639 1674 23 12
KM 53-54 1669 1801 +132 +13.2% 1658 1800 141 9
KM 54-55 1801 1922 +121 +12.1% 1802 1925 121 0
KM 55-56 1922 1973 +51 +5.1% 1922 1973 51 0
KM 56-57 1973 2043 +70 +7.0% 1972 2043 70 0
KM 57-58 2043 2095 +52 +5.2% 2042 2097 52 0
KM 58-59 2095 2136 +41 +4.1% 2093 2137 41 0
KM 59-60 2136 2114 -22 -2.2% 2111 2136 6 28
KM 60-60.57 2114 2142 +28 +2.8% 2114 2151 993 0

Notes on the calculation of the length of the route, on the altimetry and on the slope

Note 1: the length of the route is calculated using the geographic coordinates of the points that compose it, thanks to a specific formula. This value may differ slightly from the official length declared by the organizers of the race, which is valid in case of discrepancies.
Note 2: the altimetry may not correspond exactly to the real values. For routes obtained via Google API, it is possible that the altitude is that of the terrain, without considering the presence of any tunnels or viaducts. If, however, the route was obtained from GPS tracking (for example with sports watches), the error is arbitrary and may depend both on the GPS coverage at the time it was recorded and on the performance of the device used.
Note 3: the percentage slope is found by calculating considering sections of at least 50 meters and is subsequently subjected to a "smoothing" process to reduce the possibility of artifacts and obtain a more realistic trend. For classification purposes, roads with gradients between -3% and +3% are considered flat, those with gradients between +3% and +7% are uphill, and those with gradients greater than +7% are considered steep. The same classification applies to descents. This classification is to be considered arbitrary and is a choice of goandrace.com.